With the baseboard construction and track laid down, I've had a chance to plan some of the detail of the layout and typically this highlighted a problem. [...]
My exhibition layout has been designed with a track plan finalised but track plans for modular baseboards are slightly different to normal layouts. [...]
Life in lockdown continues, as does the move to our new house, which is putting a damper on my man-cave activities.
Instead, I've been looking at ways to [...]
One of my layouts, the Wandle Valley, will feature the old Tri-ang factory in Merton. Sadly, the building is no longer there which makes modelling it difficult [...]
Although the core of the model railway in a box challenge wasn't completed last time, there were a few little bits around the layout I wanted to tidy up. [...]